Service - 07

Site cleanups and shutdowns,
cleared fast.

Laydown yards, workshop clear-outs and planned shutdowns. Staged bins, scheduled collection windows and one consolidated settlement instead of a dozen separate dockets.

Staged collection windowsOne consolidated settlementMetro and regional
Why shutdowns are different

A shutdown has a clock on it.
The scrap plan should too.

During a shutdown the constraint is never the metal, it is the window. Bins fill faster than a standard swap cycle, laydown space disappears, and the recovery paperwork ends up reconstructed weeks later from memory. We plan the bin cadence against your shutdown schedule, hold spare units on site, and issue one consolidated traceability pack at the end rather than a docket per truck.

Mining operation in the Pilbara
What a big job covers

What we take on, and what we will not promise.

We do
Plan bin cadence against your shutdown schedule.
Hold spare bins on site so a swap never blocks the crew.
Segregate carbide, stainless, nickel and titanium as it comes out.
Run scheduled collection windows, including night shift.
Issue one consolidated traceability pack for the whole campaign.
Settle the campaign as a single payment.
We don't
Quote a fixed tonnage before we have seen the laydown.
Handle dangerous goods without a licensed DG carrier.
Take material that has not been made safe for lifting.
Guarantee a rate on metal we have not assayed.
How a campaign runs

Four steps. One campaign.

  • 01 / Step Site Walk We walk the laydown before the window opens, agree segregation points and set the bin cadence against your schedule. Pre-start · Scope agreed
  • 02 / Step Staged Collection Bins swapped on the agreed cycle including night shift, with spare units held so a full bin never stops the crew. 24/7 · Windows to suit
  • 03 / Step Weigh & Assay Every truck weighed and assayed on arrival at Malaga, batch-tagged to the campaign reference. 60T · Per consignment
  • 04 / Step One Settlement One consolidated traceability pack and a single EFT within 48 hours of you signing off the campaign. 48H · After final sign-off
Why work with us

Why work with Drill Bits Recyclers.

A single workshop clear-out or a six-week shutdown – the commitments do not change with the tonnage.

Planned
Before start
Site walk, segregation points and bin cadence agreed before the window opens.
Staged
Spare on site
Extra bins held so a full unit never stops the crew mid-shift.
Audited
One pack
A single consolidated traceability record for the whole campaign.
Paid fast
48 hours
One EFT within two business days of final sign-off.
Shutdown coming up?

Get the scrap plan sorted
before the window opens.

Site walk before start • Spare bins on site • One settlement at the end